07 Oct Cute Notting Hill flat refurb
We're in the process of refurbishing this cute raised ground floor flat in the heart of Notting Hill, London. We aim to be in and out within 12 weeks !...
We're in the process of refurbishing this cute raised ground floor flat in the heart of Notting Hill, London. We aim to be in and out within 12 weeks !...
We've started the process of reconfiguring and refurbishing this cute townhouse in London. We're currently digging out the basement to give the client a better head height, as well as knocking load bearing walls down in readiness for a few steel beams. 5 months to...
We we're delighted to see one of our Radlett projects recently featured in Aprils edition of '25 Beautiful Homes' magazine. It's a tough magazine to get into, but we managed it with the spectacular home we created....
The shadow gap ceiling detail in one of Radlett projects looks amazing. It gives the paintwork a real defined and crisp look. The round plaster in lights also make it look clean and sharp....
We've recently started a very large loft conversion in Radlett, Hertfordshire. The space is going to increase the existing house by an additional 1400 sq ft. We will end up with two large bedrooms and a large stunning bathroom !...
Were all but ready to start the reconfiguration and refurbishment of our clients house in NW London. Six months of dedication about to commence !...
This week we finished and handed over the artist studio we built in Radlett to our lovely clients. I want the first piece produced, dedicated to us please !...
Our project in Harrow Weald has recently completed and our delighted clients wanted to have a photo with the key people from the build. Bart is on the far left, myself and Rafa are in the middle of the clients and Daniel is on the...
Our Mill Hill project is all but ready for roof tiling. Once the windows are installed we'll be 100% ready for anything winter has to throw at us....
[vc_row][vc_column][vc_column_text]Marsh Lane, Mill Hill Site work is now in progress, having taken the house back to just the front elevation. Construction of our client's new substantial family home has started. Groundworks are now complete and the main structural build is underway.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_media_grid element_width="3" grid_id="vc_gid:1475070565916-ea2d7e07-d4f4-0" include="2716,2715,2714,2713"][/vc_column][/vc_row]...